At Custom Painting & Refinishing, we offer the highest quality Commercial Painting services at an affordable rate. There is no project too big or too small. We focus on strict safety standards, attention to detail, and timely completion of work. 

Pre-Job Inspection For Commercial Painting Projects

  • Thorough analysis of needed prep-work, failing areas, water damage, and repair work
  • Accurate estimate of materials needed for job and pricing
  • Detailed estimate providing entire scope of work and price options

Color Consultation

  • Meeting with client to discuss color themes for walls, trim, doors, and other surfaces
  • Assistance in color selection, including 3-4 test patches for each area to be painted
  • Guidance on surface sheens: flat, eggshell, satin, semi-gloss, high-gloss

Surface Preparation

  • Initial dusting/wipe-down of all areas to be painted
  • Covering of all non-painted surfaces, including: floors, cabinets, countertops, etc
  • Scraping and Sanding of peeling areas to remove lip and hide imperfections
  • Spot prime bare wood areas to allow paint adhesion
  • Full prime on areas where 2+ coats will be required (50% color tint)
  • Caulk major cracks in wall/trim surfaces, including where trim boards meet
  • Taping/masking of all windows, doors, and fixtures not being painted

Coating Application

  • Large wall areas and ceilings to be sprayed using an airless sprayer (when conditions allow)
  • Trim, doors, and windows will be brushed and rolled by hand (walls will be brushed & rolled when spraying is not an option)
  • Only the highest quality paint and materials will be used on every job we work on

Post-Job Walkthrough

  • Thorough inspection of all painted and non-painted surfaces to ensure complete coverage, jobsite cleanliness, and lasting quality of the work
  • All painted areas signed off by client before final payment is requested

Touch-Up Service

  • One year after project completion, Custom Painting & Refinishing will return at no added cost: peeling, cracking, fading, and caulking will be addressed
  • Three years after project completion: final touchups and any failing prepwork will be completed to ensure the longest lasting paint job possible